At the Sheraton Grand Hotel & Spa, Mark Smith Glazing was appointed to replace a damaged glass canopy panel above a busy external bar area.

The existing glass had cracked, creating a serious safety risk and preventing the area from being used. Our role was to safely remove the damaged pane and install a new one, allowing the space to reopen quickly and safely to the public.

Scope of Work

  • Secure and isolate the working area in a high-footfall location
  • Remove and safely dispose of the cracked glass panel
  • Install a new 13.8mm toughened laminated glass pane
  • Complete all works with minimal disruption to hotel operations

 Working at Height & Access

This project required specialist access equipment and careful planning due to the canopy’s height and location.

Key considerations included:

  • Working safely at height using appropriate access systems
  • Managing risks in a public-facing city centre environment
  • Coordinating lifting operations for a large glass pane
  • Full use of PPE and controlled exclusion zones

The installation involved handling a 4.4-metre glass panel, demonstrating our capability in large-format glazing projects.

 

Project Details

  • Location: 1 Festival Square, Edinburgh
  • Project Type: Glass canopy replacement
  • Duration: 1 day
  • Team: Specialist glazier
  • Subcontractors: None 

Materials & Installation

  • Glass Specification: 13.8mm toughened laminated glass
  • Designed for strength, safety, and durability in a public environment
  • Installed using precise handling and lifting techniques 

Challenges & Approach

  • Busy public location requiring strict safety control
  • Work at height with specialist access equipment
  • Large, heavy glass panel requiring careful manoeuvring

Our approach ensured:

  • Safe, controlled working environment
  • Efficient removal and installation process
  • Minimal disruption to hotel guests and operations

 Results

  • Safe removal of damaged glass
  • Successful installation of new canopy panel
  • External bar area reopened quickly
  • Project completed within one day

What This Project Demonstrates

  • Expertise in working at height and complex access glazing
  • Ability to deliver in live, high-traffic environments
  • Skilled handling of large-format glass installations

Strong focus on safety, precision, and efficiency